Documentation

Global Infra

The physical layer behind AI on one map: AI data centers and the power they will need, the power grid and the plants that feed it.


Overview

Global Infra is for analysts, investors and operators tracking the AI build-out. Open it at qai.io/insights/global-infra. The map opens on North America; switch between the globe and a flat map, and turn layers on and off. Map layers and data center statuses are explained in QAI Earth.


Headline figures

Six figures sit above the map: planned power at AI data centers and what they draw today, planned compute in H100-equivalent GPUs, length of power lines, substations, power plants and their recorded output. Click one to jump to its section.


Sections

SectionWhat it shows
AI data centersWhen planned power and compute come online, year by year, the largest sites by status, and announced projects.
Power gridPower lines and substations by voltage. Click a band to show only those lines on the map.
Power plantsOutput and plant counts by source, and the largest plants with their operator and output.
Data pointsEach data layer’s newest points, with the date each one is as of.
  • Click a bar or a site to find it on the map.
  • Many plants record no output, and a few record peak or planned output.

What needs an account

FeatureWhoNotes
Map, figures and chartsEveryoneEvery site, line and plant, with power and compute.
Owners, users, sources and build datesFree accountOpen to everyone for the 10 largest sites and 10 largest announced projects.
Full lists, search and sortFree accountEveryone sees the top of each list.
Looking back in time on the mapFree accountEveryone sees the latest week.

A free account needs only Google or an e-mail link.


FAQ

Are announced projects in the totals?

No. They are plans with no sign of construction yet, so they stay out of every total. They are a selection, not every plan.

Is the power grid complete?

No. The figures count what has been mapped, so coverage varies by country. Street-level cables and minor substations are left out.

Are data center power and compute figures exact?

No. They are estimates, and full-build figures are projections.

Where are the data credits?

On the QAI Earth documentation, under Credits.